Network build
Omada SDN is in place. ER605 V2 gateway, SG2008P switch, EAP225 coverage. Five VLAN roles: management, trusted, IoT, guest, and lab. 802.1Q tagging is at the gateway.
One lab, three threads: the home-network-security repo, the containers on CT 101, and the Datacenter Build board. Phase 2 is still in progress.
Phase 2 is the services host. It is not a SOC and it is not a router replacement.
Omada SDN is in place. ER605 V2 gateway, SG2008P switch, EAP225 coverage. Five VLAN roles: management, trusted, IoT, guest, and lab. 802.1Q tagging is at the gateway.
A Lenovo ThinkCentre M715q Tiny runs Proxmox. Wazuh is on CT 100. Portainer, and the other containers, are on CT 101. On-prem NetBox is the IPAM source of truth. The cloud copy is an archive. Reconcile is still open.
Off-LAN access to the rack, then a later router. WireGuard or Tailscale is not chosen. OPNsense stays in this phase.
Controller syslog decoders merged into the public repo on 2026-11-01. A Cronitor relay for GitHub Actions landed on 2026-11-08.
Proxmox on a ThinkCentre Tiny. Wazuh, Portainer, and on-prem NetBox. A full disk took Wazuh down. CT 101 was grown before NetBox moved in.
June 2026 network build. Omada gateway, switch, and APs, with five VLAN roles. The services host came later.